Before an interface goes live, it must be checked that data exchange functions correctly in both normal and exceptional circumstances.

For example, check whether data is imported in full, whether required fields are validated, and whether existing records are recognised correctly.

In addition, error messages, duplicate processing and the system’s behaviour in the event of temporary connection problems must be tested.

In the case of financial or logistical processes, it is important that the results are also checked from a functional perspective by the staff members responsible.

Only once the key scenarios have been successfully tested can the integration be put into operation in a controlled manner.